FactoryEasy
Sign in
All reports
CA reviewedAbout 6 minutes7 sections

Site Feasibility Report

Compare up to three locations against your industry, power load, workforce and logistics needs.

What is inside

  1. 01Executive summary
  2. 02Requirement profile
  3. 03Location comparison
  4. 04Infrastructure assessment
  5. 05Cost comparison
  6. 06Incentive comparison
  7. 07Recommendation

How it is produced

The arithmetic runs first, on its own

A deterministic engine computes every figure before a single word is written. If the computation fails, it fails here — before any cost is incurred — and you are refunded automatically.

The writing is drafted around placeholders

The language layer receives your numbers as opaque tokens, never as digits, and the real values are substituted in afterwards. It is structurally unable to invent a figure it was never shown.

A chartered accountant reviews it

Every numeric claim is traced back either to your own inputs or to a policy figure a named person on our team has verified against the source order. Anything that fails the check is held for review rather than quietly patched.

You are covered if it goes wrong

Nothing delivered means an automatic refund. Something incomplete means we tell you, hand it over with the gaps marked, and put a full refund one click away.